"The Best Feeling Water"

Cost Evaluation

“Your Salt Pure equipment saves us money and makes us money - we save money on chemicals and labor and make money by showing prospective customers a beautiful, sparkling aquatics area full of happy swimmers with no chlorine smell."

Click here to read entire letter

Simply complete the Evaluation Sheet, one for each body of water , and send or fax it to us. The more information you provide on the Evaluation Sheet, the more comprehensive the bid we can send back to you. Our fax number is 360-871-6871.

Online - Evaluation Sheet

Click here for Print Friendly version of the EVALUATION SHEET in PDF format.

SYSTEM DESIGN CRITERIA - SHORT VERSION (pdf. format)

This is the short version of our Evaluation sheet. Complete this form and fax to (360) 871-6871 and

we will send you a preliminary estimate of your required sizing and costs in a comprehensive bid format . If you have sizing or other concerns, we suggest you complete the Cost Evaluation Sheet above

How to go about comparing costs, click here.


The critical areas of the Evaluation Sheet are:

  • Pool dimensions and gallonage
  • Use of the pool ie: Number of bathers (bather load) in a 24 hour period
  • Hours open (in a 24 hour period)
  • Type of sanitizer
  • Maximum amount of sanitizer used in a 24 hour period
  • Current flow rate


Notes:

1.   If you are looking for accurate sizing, provide the above information in full.

2.   If you would like a cost comparison to your current method of sanitation, provide us with your annual costs.

Once we have received your Evaluation Sheet a comprehensive bid package - designed specifically for your facility - will be mailed to you together with a detailed list of references including phone numbers. We encourage you to fully investigate our system and ask your counterparts in other facilities about their experience with Salt Pure® water.

DESIGN CRITERIA/HYDRAULICS

The installation of your Salt Pure® system must:

  •   Maintain required flow and turnover rates (GPM)
  •   Comply with your Health Dept. regulations

We are available to assist you with the design of your system to meet the above mentioned criteria.

In order to do this, you would need to provide :

  •   a plumbing schematic of your pump room
  •   pipe size and flow rates.
  •   Digital photos are also very helpful in "visualizing" the installation

With this information we will work with you to design, order and install your Salt Pure® system.

Click here for Print Friendly version of BID REQUEST FORM in Microsoft Word format.

top of page

TMI Salt Pure Corp. - PO Box 433 Manchester, WA 98353 - 1 (800) 818-8266
© TMI Salt Pure Corporation, All rights reserved

e x o g r a p h i c s . c o m